Electricians dispatched to repair high voltage wire to ensure post-holiday travel peak in China's Wuhan

          Source: Xinhua| 2019-02-24 07:21:07|Editor: Li Xia
          Video PlayerClose

          CHINA-WUHAN-ELECTRICIAN-RUSH REPAIR (CN)

          Wan Fei, 40, the head of the inspection team from the Wuhan Power Supply Company under State Grid Corporation, walks through a muddy road in the mountain area of Wuhan, capital of central China's Hubei Province, Feb. 12, 2019. A team of electricians was dispatched to repair a high voltage wire that was broken due to thick layer of ice accumulation. After one day's work on the over 40-meter-high power transmission tower in bad weather condition, the team succeeded in fixing the failed power system that lowered the trains' speed causing delay during the post-holiday travel peak. This year's Spring Festival travel rush started on Jan. 21 and will last till March 1, with railway trips expected to hit 413 million in total, up 8.3 percent. (Xinhua/Xiao Yijiu)

             Prev 1 2 3 4 5  

          KEY WORDS:
          EXPLORE XINHUANET
          010020070750000000000000011100001378454891
          无码人妻一区二区三区四区av_亚洲精品911在线永久观看_精品一区二区国产在线观看_日韩不卡一区二区视频在线

                  久久男人精品女人 | 一级国产片在线观看免费 | 中文字幕无线码一区 | 亚洲有码Av一区二区三区 | 婷婷网亚洲色偷偷男人的天堂 | 天堂v亚洲国产ⅴ第一次 |