Electricians dispatched to repair high voltage wire to ensure post-holiday travel peak in China's Wuhan

          Source: Xinhua| 2019-02-24 07:21:07|Editor: Li Xia
          Video PlayerClose

          CHINA-WUHAN-ELECTRICIAN-RUSH REPAIR (CN)

          Photo taken on Feb. 12, 2019 shows an emergency worker climbing the power transmission tower for the rush repairs in the mountain area of Wuhan, capital of central China's Hubei Province. A team of electricians was dispatched to repair a high voltage wire that was broken due to thick layer of ice accumulation. After one day's work on the over 40-meter-high power transmission tower in bad weather condition, the team succeeded in fixing the failed power system that lowered the trains' speed causing delay during the post-holiday travel peak. This year's Spring Festival travel rush started on Jan. 21 and will last till March 1, with railway trips expected to hit 413 million in total, up 8.3 percent. (Xinhua/Xiao Yijiu)

             Prev 1 2 3 4 5 Next  

          KEY WORDS:
          EXPLORE XINHUANET
          010020070750000000000000011100001378454891
          无码人妻一区二区三区四区av_亚洲精品911在线永久观看_精品一区二区国产在线观看_日韩不卡一区二区视频在线

                  亚洲成AV人片乱码色午夜男男 | 欧美亚洲中文精品三区 | 婷婷色香合缴缴情 | 午夜免费福利小电影 | 丝袜一区二区三区在线播放 | 日本视频观看无卡免费精品页码 |