Electricians dispatched to repair high voltage wire to ensure post-holiday travel peak in China's Wuhan

          Source: Xinhua| 2019-02-24 07:21:07|Editor: Li Xia
          Video PlayerClose
          CHINA-WUHAN-ELECTRICIAN-RUSH REPAIR (CN)

          Aerial photo taken on Feb. 12, 2019 shows emergency worker Dong Jinbing (L) inspecting the high voltage wire with his workmate Wang Wensheng on the power transmission tower in the mountain area of Wuhan, capital of central China's Hubei Province. A team of electricians was dispatched to repair a high voltage wire that was broken due to thick layer of ice accumulation. After one day's work on the over 40-meter-high power transmission tower in bad weather condition, the team succeeded in fixing the failed power system that lowered the trains' speed causing delay during the post-holiday travel peak. This year's Spring Festival travel rush started on Jan. 21 and will last till March 1, with railway trips expected to hit 413 million in total, up 8.3 percent. (Xinhua/Xiao Yijiu)

             1 2 3 4 5 Next  

          KEY WORDS:
          EXPLORE XINHUANET
          010020070750000000000000011100001378454891
          无码人妻一区二区三区四区av_亚洲精品911在线永久观看_精品一区二区国产在线观看_日韩不卡一区二区视频在线

                  最新国产在线精品观看 | 亚洲2020最新视频在线 | 中文字幕中出在线精品 | 亚洲国产在人线播放午夜免费 | 五月天中文字幕色逼网 | 天堂va欧美ⅴa亚洲va一国产 |