New plateau airport in SW China completes construction

          Source: Xinhua| 2019-08-29 00:46:14|Editor: yan
          Video PlayerClose

          CHENGDU, Aug. 28 (Xinhua) -- Terminal construction of a new plateau airport in Ganzi Tibetan Autonomous Prefecture, southwest China's Sichuan Province, was completed Wednesday, marking the completion of the Gesar Airport.

          The airport, expected to be officially put into operation in September, is the third plateau airport in the prefecture, according to China MCC5 Group, the constructor.

          The terminal is built with characteristics of the local Gesar culture, with four check-in counters and four boarding gates. It is equipped with oxygen-producing facilities, which can deliver oxygen through more than 200 sprinklers throughout the terminal and adjust the oxygen level indoors.

          Air routes connecting the airport with Chongqing and Chengdu in southwestern China are expected to be launched in September, which are predicted to slash the travel time by about 10 hours compared with road trips.

          Construction of the airport, at an elevation of 4,068 meters, began in June 2017.

          TOP STORIES
          EDITOR’S CHOICE
          MOST VIEWED
          EXPLORE XINHUANET
          010020070750000000000000011105521383459421
          无码人妻一区二区三区四区av_亚洲精品911在线永久观看_精品一区二区国产在线观看_日韩不卡一区二区视频在线

                  午夜福利欧美一区在线观看 | 中文字幕久热精品视频在线 | 在线精品一区二区三区 | 久久99精品麻豆国产 | 亚洲一区二区欧美精品 | 亚洲日韩在线视频 |