China's first tidal power unit connected to grid for one year

          Source: Xinhua| 2018-06-01 16:15:41|Editor: Li Xia
          Video PlayerClose

          HANGZHOU, June 1 (Xinhua) -- China's first tidal power station has been connected to the grid for a year, the longest stable use of the renewable energy, according to the developer.

          The 3.4 mega-watt generating unit built by Hangzhou Lin Dong Ocean Energy Technology Co. Ltd. in Zhoushan City, east China's Zhejiang Province, has sent over 800,000 kilowatt hours of electricity to the grid.

          Lin Dong, chief engineer and chair of the company, said on Thursday that when all turbines of the generating unit are installed in November, it will have an annual power output of 6 million kilowatt hours, enough for supplying electricity for 3,000 households annually.

          The previous record of tidal energy power generation was set in Britain with a four-month supply in 2015.

          He said the company is aiming at building a 15 mega-watt or 20 mega-watt power unit that can break even the cost, making the sustainable energy feasible.

          Lin is expecting foreign orders, with representatives from Canada and New Zealand interested.

          TOP STORIES
          EDITOR’S CHOICE
          MOST VIEWED
          EXPLORE XINHUANET
          010020070750000000000000011100001372231461
          无码人妻一区二区三区四区av_亚洲精品911在线永久观看_精品一区二区国产在线观看_日韩不卡一区二区视频在线

                  在线看又黄又爽成年视频 | 亚洲香蕉午夜国产理论电影 | 日韩网战一区二区三区 | 亚洲国产日韩在线丝袜 | 在线亚洲中文精品第1页 | 亚洲网站入口免费在线观看 |