China's first tidal power unit connected to grid for one year

          Source: Xinhua| 2018-06-01 16:15:41|Editor: Li Xia
          Video PlayerClose

          HANGZHOU, June 1 (Xinhua) -- China's first tidal power station has been connected to the grid for a year, the longest stable use of the renewable energy, according to the developer.

          The 3.4 mega-watt generating unit built by Hangzhou Lin Dong Ocean Energy Technology Co. Ltd. in Zhoushan City, east China's Zhejiang Province, has sent over 800,000 kilowatt hours of electricity to the grid.

          Lin Dong, chief engineer and chair of the company, said on Thursday that when all turbines of the generating unit are installed in November, it will have an annual power output of 6 million kilowatt hours, enough for supplying electricity for 3,000 households annually.

          The previous record of tidal energy power generation was set in Britain with a four-month supply in 2015.

          He said the company is aiming at building a 15 mega-watt or 20 mega-watt power unit that can break even the cost, making the sustainable energy feasible.

          Lin is expecting foreign orders, with representatives from Canada and New Zealand interested.

          TOP STORIES
          EDITOR’S CHOICE
          MOST VIEWED
          EXPLORE XINHUANET
          010020070750000000000000011100001372231461
          无码人妻一区二区三区四区av_亚洲精品911在线永久观看_精品一区二区国产在线观看_日韩不卡一区二区视频在线

                  一本一本久久A久久精品综合 | 日本一道丝袜国产一区高清 | 亚洲色婷婷综合久久久久中文 | 亚洲综合久久一本伊一区 | 久久免费人成看片中文 | 亚洲最大日韩精品一区365 |