U.S.-Mexico border wall construction begins in California
                           Source: Xinhua | 2018-02-23 04:42:58 | Editor: huaxia

          Members of a family hug each other during the event "Hugs not Walls" at the riverbed of the Rio Grande river at the border between Mexico and the United States in Juarez, Mexico, on June 24, 2017. The event provided an opportunity for families who live across the border to hug their loved ones for four minutes. (Xinhua/David Peinado)

          LOS ANGELES, Feb. 21 (Xinhua) -- U.S. Customs and Border Protection (CBP) announced Wednesday that U.S. government has started work on construction for a border wall replacement near downtown Calexico, about 190 km east of San Diego in the state of California.

          The project covers an area from approximately the Calexico West Port of Entry extending westward beyond the Gran Plaza Outlets, which includes around 2.25 miles of all-weather roads, according to a statement released by the federal agency.

          A wall in this area was built in the 1990s out of recycled scraps of metal and old landing mat, and the El Centro Sector wall replacement is one of Border Patrol's highest priority projects, said the CBP statement.

          File photo taken on Jan. 10, 2018 shows the eight border wall prototypes between Mexico and the U.S., Tijuana, Mexico. (Xinhua/Xu Rui)

          The construction of a more substantial replacement wall will better ensure the safety of agents and the public and create a better atmosphere for business and commerce, while enhancing overall border security, the statement added.

          It's the first border construction project contract awarded by the Trump administration aside from eight different prototypes of border wall that were built near the Otay Mesa border crossing San Diego.

          File photo taken on Feb. 15, 2016 shows migrant people reunite with their beloved at the border between Mexico and the United States in Anapra, Chihuahua state, Mexico. (Xinhua/Guillermo Arias)

          The Trump administration told U.S. Congress last month that it wants 18 billion U.S. dollars over the next decade for the initial phase of a U.S.-Mexico border wall.

          Half of the around 3,300-km border between the two nations would have a border wall or other fences by 2027 if the work was completed.

          Back to Top Close
          Xinhuanet

          U.S.-Mexico border wall construction begins in California

          Source: Xinhua 2018-02-23 04:42:58

          Members of a family hug each other during the event "Hugs not Walls" at the riverbed of the Rio Grande river at the border between Mexico and the United States in Juarez, Mexico, on June 24, 2017. The event provided an opportunity for families who live across the border to hug their loved ones for four minutes. (Xinhua/David Peinado)

          LOS ANGELES, Feb. 21 (Xinhua) -- U.S. Customs and Border Protection (CBP) announced Wednesday that U.S. government has started work on construction for a border wall replacement near downtown Calexico, about 190 km east of San Diego in the state of California.

          The project covers an area from approximately the Calexico West Port of Entry extending westward beyond the Gran Plaza Outlets, which includes around 2.25 miles of all-weather roads, according to a statement released by the federal agency.

          A wall in this area was built in the 1990s out of recycled scraps of metal and old landing mat, and the El Centro Sector wall replacement is one of Border Patrol's highest priority projects, said the CBP statement.

          File photo taken on Jan. 10, 2018 shows the eight border wall prototypes between Mexico and the U.S., Tijuana, Mexico. (Xinhua/Xu Rui)

          The construction of a more substantial replacement wall will better ensure the safety of agents and the public and create a better atmosphere for business and commerce, while enhancing overall border security, the statement added.

          It's the first border construction project contract awarded by the Trump administration aside from eight different prototypes of border wall that were built near the Otay Mesa border crossing San Diego.

          File photo taken on Feb. 15, 2016 shows migrant people reunite with their beloved at the border between Mexico and the United States in Anapra, Chihuahua state, Mexico. (Xinhua/Guillermo Arias)

          The Trump administration told U.S. Congress last month that it wants 18 billion U.S. dollars over the next decade for the initial phase of a U.S.-Mexico border wall.

          Half of the around 3,300-km border between the two nations would have a border wall or other fences by 2027 if the work was completed.

          010020070750000000000000011105091369924291
          无码人妻一区二区三区四区av_亚洲精品911在线永久观看_精品一区二区国产在线观看_日韩不卡一区二区视频在线

                  久久精品日本亚洲优女 | 亚洲v欧美v日韩v在线观看 | 婷婷国产天堂久久综合亚洲 | 亚洲国产日韩欧美在线看片 | 亚洲国产日韩精品一区二区 | 综合色婷婷在线播放 |